LAYING TECHNIQUES |
|
|
|
PREPARE THE BED (PCC/MORTAR) WITH MINIMUM UNDULATIONS WITH COARSE FINISH
ON TOP OF THE PREPARE BASE LAY A LAYER OF RICH MORTAR 15MM THICK WITH CEMENT
SLURRY/PASTE ON TOP. CHECK UNIFORMITY OF SPACE BETWEEN JOINTS, LINE / LEVEL ADJUSTMENTS (HORIZONTAL & VERTICAL). FILL THE JOINTS (GAPS BETWEEN TILES) WITH THE GROUTING MATERIAL OF AN IDENTICAL
COLOUR AS OF TILE. IN THIS CASE USE POLYSTER RESIN & HARDNER ALONG WITH A CEMENT
MIXED OF SAME COLOUR. GRINDING OF TILES WHETHER ON THE POLISHING MACHINE OF THE FACTORY OR ON SITE ON |
|
|
|